Classroom IQ Field Riser, 24" Tall, 6'x8'

72-92

New product

Elevate your VEX IQ field by 24" to gain valuable storage space while creating a competition-like field setup to practice on.  Install folding workbenches on the sides, shelves underneath, cabinets for Robosource's storage trays, store robot cases, and so much more.

  • Strong & Durable: Welded & powder-coated steel frame with ¾” black wood top

  • Portable: Individual sections fit through doors

  • Sized to perfectly fit a 6 x 8 foot VEX IQ field and includes flanges to hold the perimeter

  • Quick & easy setup

  • Adjustable feet to accommodate uneven floors

Looking for a more portable solution? Consider our 16" tall Mobile Folding IQ Field Riser.

More details

Out of Stock

$995.00

Add to wishlist

More info

Drawings and 3D CAD files are available for all storage furniture and field risers: Click here

Further Details

  • Please note that the 24” height of this riser is taller than a typical competition-height VEX IQ field. This is intentional to maximize storage capability in your classroom. 

  • Updated version includes 4 sections measuring slightly larger than 3x4 feet, perimeter retention flanges, and all necessary hardware. There is no longer any gaps between sections.

  • Please note: Folding desks and shelves can only be installed along the 8ft long sides of the riser, not along the 6ft long sides.
  • Total riser weight is approximately 340lbs.

  • Weight limit of 200 pounds per section.

  • VEX IQ Competition field, perimeter, and game not included

Shipping Information

Due to the size of this item, it must be packed on a pallet and shipped by truck freight (LTL). Options are available for having the pallet delivered to your location or picking it up at a nearby freight terminal, which is the lowest cost option and may be the most convenient if you don't have a loading dock.

Assembly Information

When you first receive your field risers, you will need to attach the plywood to the welded frame using the included wood screws. After that, any subsequent setup or takedown consists of only the following steps:

  1. Attach legs by screwing 4 bolts into pre-installed threaded inserts

  2. Use adjustable feet to level platform

  3. If multiple platforms are set up for a full field, place platforms next to each other and adjust feet to level each platform. Two bolts are then installed into threaded inserts at each interface between sections. These bolts are only to prevent platforms from separating and should not bear any weight. This is why each platform must be leveled before connecting to one another.

Path: > > > Classroom IQ Field Riser, 24" Tall, 6'x8'